Best practices for storing, installing, terminating, and commissioning Addis Cable products safely.

Get installation guidance

Guidance Topics

  • Storage, handling, and drum management
  • Pulling tensions, sidewall pressure, and bend radius
  • Termination and jointing considerations for LV/MV
  • Sheath testing, phasing, and commissioning checks

Field Support

  • On-site toolbox talks for installers
  • Recommended accessories and compatible hardware
  • Inspection checklists before energization

Request Guides

  • Tell us cable type, voltage class, and installation environment
  • We provide PDF guides and commissioning templates